ROCKCOTE Marrakesh Lime Plaster Finishes - Plasterboard
General
Description of Works/Specification Notes
ROCKCOTE Marrakesh is a fine/medium grained lime plaster that can be used on the interior.
ROCKCOTE Marrakesh is composed of hydrated lime, natural aggregates and additives.
ROCKCOTE Marrakesh can be tinted with alkali resistant mineral pigments to achieve a range of natural colours and attractive patina effects.
When applied by a skilled ‘Resene Construction Systems Artisan’ ROCKCOTE Marrakesh can be worked to a smooth polished look, but many different styles of finish can be achieved by using different trowels, floats, sponges and finishing techniques.
Properties
- Volume Solids: 100%
- Coverage Rate: Approximately 3 square meters per 16kg bag at 4mm thickness.
- Substrates: All prepared base coats of plaster, plasterboard
- Abrasive strength: Excellent
- Adhesion: Excellent
- Vapour Permeability: No vapour barrier formed
- VOC: 1 grams per litre
- Colour: grey
- Packaging: 16kg bags
- Clean up: Water while the product is wet
- Use by: 6 months from date of manufacture
- Storage: Cool, dry place of the ground
- Application Temperature: + 5 °C to + 30 °C
- Usual No Coats: 2
- Drying/Curing Time: 28 days
- Touch Dry: 8 hours
- Dry to Recoat: 24 hours
- Film Build: Approximately 2mm dry film build per coat
- Thinning: N/A
- Mean Vapour flow rate: 54.99g/m²d (ASTM E96/E96M-13 Water Method)
- Mean Resistance: 2.01MNs/g (ASTM E96/E96M-13 Water Method)
- Fire Group Classification: 1-S (Test in accordance with ISO 5660:2002)
Building Code Compliance
If the project has a building consent then the following clauses apply.
B2 – Durability
This specification complies with the requirements as set out in B2 – Durability which must always be considered when demonstrating compliance with each of the clauses of the Building Code. It ensures that a building throughout its life will continue to satisfy the performance of the Building Code. It confirms the use of materials that will remain functional throughout the specified intended life of the building, but not less than 50, 15 or 5 years
This system meets the expected durability of the NZBC of at least 5 years
F2 – Hazardous building materials
This specification complies with the requirements as set out in F2 – Hazardous building materials which safeguards people from illness and injury from quantities of gas, liquid, radiation and solid particles caused by exposure to building materials
On Going Maintenance Instructions
Provide ongoing maintenance instructions required to meet the performance requirements of the NZBC.
Building Consent Authority Requirements
All the appropriate inspections are to be carried out by a BCA representative and that it complies with the NZBC requirements.
Documents
Abbreviations
The following abbreviations are used throughout this work section:
- BCA – Building Consent Authority
- LBP – Licensed Building Practitioner
- PPCS – Proprietary Plaster Clading System
- MPNZA – Master Painters of New Zealand Association
- MSDS – Material Safety Data Sheet
- NZBC – New Zealand Building Code
Manufacturers Documents
Copies of the above relevant company documents referred to in this specification are available at;
Resene Construction Systems
Web: reseneconstruction.co.nz
Telephone: 0800 50 70 40
No Substitutions
Substitutions are not permitted to any specified Resene Construction Systems system. Materials and execution to Resene Construction Systems specification except where varied by this specification and supported by architectural detailing.
Documentation
Finish Sample
Submit one 300 mm x 300 mm sample of the selected texture finish and colour for approval on request by the main contractor or specifier. Obtain signature of acceptance on sample and return to the Registered Plasterer.
Maintenance Instructions
Provide Resene Construction Systems Maintenance Guide on or before practical completion of the contract for issuing to the building owner. Resene Construction Systems Maintenance Guide to be provided on request.
Health and Safety
Refer to the requirements of the Health and Safety in Employment Act 2015 and Worksafe NZ: Guidelines for the provision of facilities and general safety in the construction industry. If the elimination or isolation of potential hazards and risks is not possible then minimise hazards and risks in this work on site by using the proper equipment and techniques as required in the MPNZA Painters hazard handbook. Supply protective clothing and equipment. Inform employees and others on site of the hazards and put into place procedures for dealing with emergencies. Obtain from Resene Construction Systems the Material Safety Data Sheets for each product. Keep sheets on site and comply with the required safety procedures. Confirmation at the start of the project as to whether a Site Specific Safety Plan is to be produced by the Registered Plasterer prior to works starting.
Warranty
Warrant this system under normal environmental and use conditions against failure. Resene Construction Systems system warranty.
Materials: by Resene Construction Systems – 5 Years Materials only
Execution: by Registered Plasterer – 5 Years Workmanship only
Components Used
Acrylbond Resin – 20kg
- Multi-purpose Resin supplied in 20kg containers
MultiStop Bedding Compound
- Polymer-modified, cement based dry plaster mix. Supplied in 20kg bags.
Marrakesh Interior Plaster
- Applied to approximately 2mm thick per coat
- 2 coats of equal thickness one application directly over the previous.
Resene Quick Dry
- Resene Quick Dry waterborne primer undercoat provides long-term flexibility over unstable substrates coupled with exceptional durability even when left uncoated for prolonged periods.
- Installed over the plastered joins prior to a full sealer coat/slurry coat
Lime Plaster Basecote
ROCKCOTE Lime Plaster Basecote is a fine grained lime plaster that can be used both interior and exterior including areas of high humidity such as bathrooms and ROCKCOTE Lime Plaster Basecote is composed of hydrated lime, natural aggregates and additives. ROCKCOTE Lime Plaster Basecote is an ideal undercoat for ROCKCOTE Marrakesh
Installation/Application
Check and Prepare Plasterboard Linings
Preparation based on new substrate installations.
Preliminary Checks
Plasterboard must be taped and stopped to a level 4 finish according to Plasterboard manufacturer’s specifications.
Clean Surface
When the substrate has been left for a period of time, dust and dirt may build up on the surface. This contamination must be removed prior to render application.
Masking
Before applying the render, masking must be applied to all joinery, pipes, roofs, and all areas likely to be marked by the render. Use drop cloths and ground covers to keep the working areas clean.
Resene QuickDry
Application
Apply by brush, speed brush, synthetic fibre roller or spray. Spray application is generally not preferred for the first coat.
Apply one to two coats of Resene Quick Dry allowing two to four hours between coats. Lightly sand between coats. For porous surfaces, it may be desirable to thin the first coat with up to 10% clean water.
Resin/MultiStop Bedding Slurry Coat
Surface Preparation
Ensure surface is clean, sound, dry and free from dust, dirt, grease, mould and lichen.
Application
Mix a solution of Acrylbond and Rockcote MultiStop together and apply using a roller or brush. A high solids roller can also be used to ensure the solution is evenly distributed across the wall surface.
For pourous substrates (eg. brick, concrete) mix a 50:50 5L mix of Acrylbond/water and a 1 kg of MultiStop/AAC Adhesive/Hydroplast to the mix.
For other surfaces (including painted) ensure a 5 Litre of Acrylbond is mixed directly with 1 kg of MultiStop/AAC Adhesive/Hydroplast.
If you are unsure of the surface you are applying the slurry to, apply to a small section of wall and test for adhesion.
Rockcote Lime Plaster Basecote Levelling Coat
Surface Preparation
Ensure surface is clean, sound, dry and free from dust, dirt, grease, mould and lichen.
Mixing
When applying over plasterboard ensure that 25% of the liquid mix should be made up of Acrylbond.
Application
Plaster can be applied with a steel trowel not less than 1mm thick (5m2 per bag at 2mm thick). Apply with firm pressure lay in mesh and trowel well to embed mesh (for base coat only). Apply plaster only when the temperature is between 5°C and 30°C and will be in that range for the 24 hours period following application.
Curing:
Render should be protected from hot drying winds and direct sunlight for the first 16 hours. Protect newly applied plaster from rain and water run off for the first 24 hours.
Rockcote Marrakesh (2 Coats)
Apply first coat of Rockcote Marrakesh to the prepared substrate at not less than 2-3mm mm thick. Flatten / level the surface with a moist sponge float. Allow the first coat to ‘take up’ – generally 1-2 hours at 18 degrees prior to applying the second coat.
Important:
This specification must be read in conjunction with the Resene Construction Systems technical drawings.
No alteration to the Resene Construction Systems RenderSpec® is permitted.
All Technical Data Sheets are available at https://reseneconstruction.co.nz/technical-library/technical-data-sheets/
All Safety Data Sheets are available at https://reseneconstruction.co.nz/technical-library/safety-data-sheets/






