Install Substrate
2.1 Check Timber or Steel Framing2.2 Cavity and Batten Installation2.3 Fastening EPS / XPS / Graphex board - to timber / steel frame2.4 Fastening Integra Panels to Steel/Timber Frame2.5 Fastening EPS / XPS / Graphex board - to solid filled masonry2.6 Installing Integra Lightweight Concrete Flooring2.7 Installing Integra Fence Posts and Panel
Check & Prepare Substrates
2.10 Check and Prepare XPS2.11 Check and Prepare Integra Panels2.12 Check and Prepare Insitu/Precast Concrete2.13 Check and Prepare Solid Filled Masonry2.16 Check and Prepare Existing Plaster2.17 Check and Prepare Existing Unpainted Masonry / Brick / Stone2.18 Check and Prepare Existing Weatherboards2.19 Check and Prepare Existing Rigid Backing Sheets2.20 Prepare Existing Painted Surfaces2.21 Check and Prepare Magnesium Board Substrates2.22 Waterblast Surface2.23 Check and Prepare Waterproof Membrane Coatings (by others)2.8 Check and Prepare Plasterboard Linings2.9 Check and Prepare EPS / Graphex3.1 Check and Prepare Masonry / Clay brick veneer Substrate3.2 Check and Prepare Fibre Cement Sheet Substrates3.3 Check and Prepare ICF Substrates